Top energy developer warns on overbuilding power supplies for AI - FT中文网
登录×
电子邮件/用户名
密码
记住我
请输入邮箱和密码进行绑定操作:
请输入手机号码,通过短信验证(目前仅支持中国大陆地区的手机号):
请您阅读我们的用户注册协议隐私权保护政策,点击下方按钮即视为您接受。
商业快报

Top energy developer warns on overbuilding power supplies for AI

David Crane says data centres should bear the cost of developing infrastructure to serve their demand
00:00

{"text":[[{"start":8.88,"text":"A leading US clean energy investor has warned of the risk of overbuilding energy infrastructure for the AI boom, urging power companies to require data centres cover the cost of the build-out — whether they use the electricity or not."}],[{"start":26.560000000000002,"text":"David Crane, chief executive of Generate Capital, an investment firm with $8bn assets under management, told the FT that data centres’ rush to secure electricity may result in excess power plants — the costs of which could fall on power companies."}],[{"start":44.790000000000006,"text":"“As much as the data centre people tell you their demand for electricity is infinite, it feels to me like there will be a time when they’ll be overbuilt. They’re going to have spare electrons,” he said. "}],[{"start":59.290000000000006,"text":"“Someone’s got to pay for the infrastructure that’s put in place and then not being used . . . you need to have take-or-pay contracts, so if they suddenly don’t need the power, it’s on the back of the data centre company, not the power company.”"}],[{"start":74.08000000000001,"text":"Generate Capital is a sustainable infrastructure investor and owner-operator, with a focus on sectors such as power, electric vehicles and industrial decarbonisation. "}],[{"start":86.41000000000001,"text":"The company develops on-site gas, battery and renewable power supplies for data centres and holds investments in data centre developers such as Soluna. "}],[{"start":97.96000000000001,"text":"Crane served as under-secretary for infrastructure in former president Joe Biden’s energy department and as CEO of power giant NRG Energy. "}],[{"start":108.91000000000001,"text":"His comments come as the US power grid struggles to keep up with the wave of data centre-fuelled electricity demand."}],[{"start":117.4,"text":"BloombergNEF estimates US data centre power demand is set to surge from 34.7 gigawatts in 2024 to 106GW by 2035."}],[{"start":130.75,"text":"Companies such as Sam Altman’s OpenAI have warned AI “requires far more electricity than the US can currently provide and the growing shortfall threatens our leadership”."}],[{"start":143.68,"text":"To avoid long waits to connect to the grid and alleviate concerns about their impact on utility bills, data centre companies are turning to on-site power plants and contracting newly built supply, and power companies are rushing to meet this demand. "}],[{"start":160.11,"text":"NextEra Energy, the largest electricity company in the US, said it is planning to build at least 15GW of new plants ‌for data centres over the next nine years, equivalent to the power demands of 15mn homes."}],[{"start":178.5,"text":"Utility capital spending plans have risen 19 per cent for 2026 to 2030, according to Wolfe Research."}],[{"start":188.48,"text":"But concerns are rising over how large data centre’s ultimate demand for power will be and how the costs to build them will be recovered. "}],[{"start":200.07999999999998,"text":"Because on-site power plants are less reliable than a grid connection, they have to be built oversized to ensure the data centre stays online. If a data centre is eventually connected to the grid it may end up with more energy than it needs."}],[{"start":218.13,"text":"Data centres could also require less power as AI chips become more efficient, or if quantum computing takes off."}],[{"start":227.01,"text":"“The AI ship has sailed, but the energy cost of serving it is very much in question,” said Ben Hertz-Shargel, global head of grid edge at Wood Mackenzie."}],[{"start":239.44,"text":"However, Crane said overbuilding could present an “opportunity” if planned for correctly, with underused power plants integrated back into the grid to boost supply for regular customers and bring down electricity costs."}],[{"start":266.16,"text":""}]],"url":"https://audio.ftcn.net.cn/album/a_1774945518_9545.mp3"}

版权声明:本文版权归FT中文网所有,未经允许任何单位或个人不得转载,复制或以任何其他方式使用本文全部或部分,侵权必究。

随着通胀担忧升温,美联储是否正转向鹰派?

政治动荡和伊朗战争正在对英国经济产生什么影响?德国如何应对这次石油冲击?

中国AI企业在视频生成竞赛中领先美国对手

字节跳动和快手表现优于西方竞争对手,推动广告和娱乐领域的AI视频质量全面提升。

中国数据中心分拆公司计划在新加坡和美国双重上市

DayOne计划按照这座城邦为提振亚洲企业上市而制定的新规,筹集50亿美元。

巴塔哥尼亚从汉坦病毒中汲取的经验

在阿根廷2018年暴发鼠源病毒疫情后,疑有乘客在此遭感染的地区已收紧管控。

永无止境的AI劣质内容正给企业漏洞赏金计划带来压力

“漏洞赏金”计划收到的AI生成的无效报告数量激增。

全球冲突推动地缘政治进入高管课程

中东及其他地区的商学院纷纷回应动荡时期企业对指引日益增长的需求。
设置字号×
最小
较小
默认
较大
最大
分享×